Sep 23, 2024  
2014 - 2015 CNM Catalog April 2014, Volume 47 
    
2014 - 2015 CNM Catalog April 2014, Volume 47 [The CNM Academic Year includes Fall, Spring, Summer Terms]

ELTR 2692 - PV Installation Lab

3 credit hour(s)
(Pre- or corequisite: ELTR 2630  or school approval)

Photovoltaic installation practices and safety are emphasized covering lockout tag out, testing high voltage, hazards, safety equipment, site safety, first aid, PV panel layout, pitch roof mounting systems, flat roof mounting systems, pole mount systems, disconnect installation, wiring sizing and installation, inverter installation, commissioning checklist.
Note(s)
  • 135 lab hours